Thanks to the implementation of the ordinance for incorporating systems capture solar energy, energy saving and rationalization of water uses, which has been achieved in just over a year the city already has in the process of installation in more 50 points to sustainable energy production.
Finally, the plan is designed to expand the production capacity of photovoltaic energy during the period 2008-20012.
It foresees the installation of 5260 new photovoltaic modules, capable of producing 828 MWp, with an estimated annual production of 22.45 MWh. The total area of new plates planned to install photovoltaic is 15780 sq metres. Multiply in thirteen times the current installed surface.
Incorporation of systems to improve energy efficiency and renewables. New public hauses promotion Systems capture solar energy for heating water: 102 houses promoting urban Front River, about 130 feet to the promotion of the Pyrenees and 40 public housing neighborhoods, Raval and Fondo. Municipal teams Public Primary Schools Beethoven and Sant Just. Secondary schools Terra Roja and Numància. Municipal sport center Carrer Washington.
|
New municipal equipment that have installed photovoltaic systems plates. Project CEIP Ferran de Segarra, with an output of 17.45 KWP. CEIP Torre Balldovina, with 22.500 kwp per year. Municipal Cementery of santa Coloma: The expansion of facilities during 2007, allows a production peak of 102.564 kw. Institute of secondary education Ramon Berenguer IV : Currently reaches 5 Kwp. Polygons of companies bosc Llarg: here the production photovoltaic energy reaches 9 Kwp. Central Library:The plates installed photovoltaic generating an output of 10Kwp. |